5.3002.2 Sequence of Operation—Low Rise

Topic: 
Forced Air
Subtopic: 
Site Preparation
Desired Outcome: 
Sequence of operation of the system verified
TitleSpecification(s)Objective(s)
5.3002.2a
Verification

The sequence of operation of the system will be verified in accordance with the manufacturer's installation, operation, and maintenance manuals

Ensure system components function and operate in the correct sequence