5.3002.3 Sequence of Operation—Mid and High Rise

Topic: 
Forced Air
Subtopic: 
Site Preparation
Desired Outcome: 
Sequence of operation is functionally tested
TitleSpecification(s)Objective(s)
5.3002.3a
Verification

Sequence of system operation will be verified in accordance with the design documents, and the manufacturer's installation, operation, and maintenance manuals

Ensure system components function and operate in the correct sequence