Specification History
| SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status | 
|---|---|---|---|---|---|---|---|
| Version 2020 | 14/08/2020 - 14:25 | 5.0105.3c | Rigid transition | Install a rigid metal transition (e.g., rigid elbow) for all changes in airflow direction that is the same size as the crossover duct and is positioned towards the direction of flow | Maximize airflow | Black Line | |
| Version 2020 | 14/08/2020 - 14:25 | 5.0105.3c | Rigid transition | Install a rigid metal transition (e.g., rigid elbow) for all changes in airflow direction that is the same size as the crossover duct and is positioned towards the direction of flow | Maximize airflow | Black Line | |
| Version 2020 | 14/08/2020 - 14:25 | 5.0105.3c | Rigid transition | Install a rigid metal transition (e.g., rigid elbow) for all changes in airflow direction that is the same size as the crossover duct and is positioned towards the direction of flow | Maximize airflow | Black Line |