Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 14/08/2020 - 14:26 | 5.0288.1c | Blow-down pit | Clean blow-down pit out to handle the volume of water required to sufficiently reduce blow-down temperature for safe discharge Clear blow-down pit connection to the drain system |
Blow-down temperature is within acceptable temperatures and pit drains correctly |
Black Line | ||
Version 2020 | 14/08/2020 - 14:26 | 5.0288.1c | Blow-down pit | Clean blow-down pit out to handle the volume of water required to sufficiently reduce blow-down temperature for safe discharge Clear blow-down pit connection to the drain system |
Blow-down temperature is within acceptable temperatures and pit drains correctly |
Black Line |