Version 2020 14/08/2020 - 14:26 5.0288.1c Blow-down pit

Clean blow-down pit out to handle the volume of water required to sufficiently reduce blow-down temperature for safe discharge

Clear blow-down pit connection to the drain system

Blow-down temperature is within acceptable temperatures and pit drains correctly

Black Line
Version 2020 14/08/2020 - 14:26 5.0288.1c Blow-down pit

Clean blow-down pit out to handle the volume of water required to sufficiently reduce blow-down temperature for safe discharge

Clear blow-down pit connection to the drain system

Blow-down temperature is within acceptable temperatures and pit drains correctly

Black Line