Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:27 7.0103.4b Installation

De-energize circuit and lock out power before work begins

Locate and install fixture in accordance with NFPA 101 and NFPA 70

Safe, proper, and functioning installation

Black Line
Version 2020 08/14/2020 - 14:27 7.0103.4b Installation

De-energize circuit and lock out power before work begins

Locate and install fixture in accordance with NFPA 101 and NFPA 70

Safe, proper, and functioning installation

Black Line