Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 14/08/2020 - 14:23 | 4.0103.3d | Installation | Install batt insulation to prescribed R-value in full contact with the existing insulation batts without gaps, voids, compressions, or misalignments If the top of the existing insulation is below the top of the framing, install new batts parallel with framing members If the top of the existing insulation is above the top of the framing, install new batts perpendicular to framing members |
Uniform insulation depth in continuous contact with existing insulation without voids |
Black Line | ||
Version 2020 | 14/08/2020 - 14:23 | 4.0103.3d | Installation | Install batt insulation to prescribed R-value in full contact with the existing insulation batts without gaps, voids, compressions, or misalignments If the top of the existing insulation is below the top of the framing, install new batts parallel with framing members If the top of the existing insulation is above the top of the framing, install new batts perpendicular to framing members |
Uniform insulation depth in continuous contact with existing insulation without voids |
Black Line |