Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 14/08/2020 - 14:23 4.0104.3c General preparation

Permanently secure existing batt insulation in full contact with the existing air barrier and sides of the existing cavity without gaps, voids, compressions, or misalignments

Align pressure and thermal boundary

Black Line
Version 2020 14/08/2020 - 14:23 4.0104.3c General preparation

Permanently secure existing batt insulation in full contact with the existing air barrier and sides of the existing cavity without gaps, voids, compressions, or misalignments

Align pressure and thermal boundary

Black Line