Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 14/08/2020 - 14:23 4.0104.6c General preparation

Install durable backing material over any escape holes in the air barrier

Install flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements

Prevent SPF leakage

Black Line
Version 2020 14/08/2020 - 14:23 4.0104.6c General preparation

Install durable backing material over any escape holes in the air barrier

Install flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements

Prevent SPF leakage

Black Line