Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 14/08/2020 - 14:23 | 4.0201.1c | General preparation | Remove existing insulation and vapor retarders from installation area Cover all finished surfaces areas (e.g., windows, doors) in the installation area with appropriate materials (e.g., plastic, masking tape) Install durable backing material over any escape holes in the air barrier and ensure utility junctions remain accessible per local code requirements |
Protect finished surfaces from overspray and prevent SPF leakage |
Black Line | ||
Version 2020 | 14/08/2020 - 14:23 | 4.0201.1c | General preparation | Remove existing insulation and vapor retarders from installation area Cover all finished surfaces areas (e.g., windows, doors) in the installation area with appropriate materials (e.g., plastic, masking tape) Install durable backing material over any escape holes in the air barrier and ensure utility junctions remain accessible per local code requirements |
Protect finished surfaces from overspray and prevent SPF leakage |
Black Line |