Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 14/08/2020 - 14:24 4.0201.2d Batt installation

Install batt insulation to prescribed R-value in every joist bay in full contact with the air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments

If batt contains a facing material install it in contact with the conditioned space

Continuous and contiguous thermal boundary

Black Line
Version 2020 14/08/2020 - 14:24 4.0201.2d Batt installation

Install batt insulation to prescribed R-value in every joist bay in full contact with the air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments

If batt contains a facing material install it in contact with the conditioned space

Continuous and contiguous thermal boundary

Black Line