Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 14/08/2020 - 14:24 | 4.0202.1e | Access cavity | Exterior access: Remove the exterior cladding at the insulation access point when feasible Neatly cut any vapor retarder installed and minimize air barrier and drainage plane disruption Create an access hole through the sheathing sufficient to access the cavity with fill tube Interior access: Set up dust containment enclosure in installation area Create access holes through the interior wall surface in a straight horizontal line sufficient to access the cavity with fill tube without damaging the wall surface |
Access all wall cavities safely and prepare for access closure |
Black Line | ||
Version 2020 | 14/08/2020 - 14:24 | 4.0202.1e | Access cavity | Exterior access: Remove the exterior cladding at the insulation access point when feasible Neatly cut any vapor retarder installed and minimize air barrier and drainage plane disruption Create an access hole through the sheathing sufficient to access the cavity with fill tube Interior access: Set up dust containment enclosure in installation area Create access holes through the interior wall surface in a straight horizontal line sufficient to access the cavity with fill tube without damaging the wall surface |
Access all wall cavities safely and prepare for access closure |
Black Line |