Version 2020 | 14/08/2020 - 14:24 | 4.0301.7d | Installation | Install batts over 100% of accessible area to prescribed R-value in full contact with the air barrier and all structural framing without gaps, voids, compressions, or misalignments If vapor retarder facing exists, install it facing the conditioned area |
Continuous and contiguous thermal boundary that prevents excessive vapor intrusion |
Black Line | ||
Version 2020 | 14/08/2020 - 14:24 | 4.0301.7d | Installation | Install batts over 100% of accessible area to prescribed R-value in full contact with the air barrier and all structural framing without gaps, voids, compressions, or misalignments If vapor retarder facing exists, install it facing the conditioned area |