Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 14/08/2020 - 14:24 4.0301.8d General preparation

Remove any existing insulation or vapor barrier materials from installation area

Install flags that can be seen below the insulation level at any utility junctions that will be covered by insulation

Prevent condensation, identify utility junctions for future access

Black Line
Version 2020 14/08/2020 - 14:24 4.0301.8d General preparation

Remove any existing insulation or vapor barrier materials from installation area

Install flags that can be seen below the insulation level at any utility junctions that will be covered by insulation

Prevent condensation, identify utility junctions for future access

Black Line