Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 14/08/2020 - 14:24 | 4.0302.7d | General preparation | Remove any existing insulation or vapor barrier materials from installation area Remove any obstacles, fasteners, or protruding objects that will prevent insulation from fully contacting the bottom of the floor joist |
Prevent condensation, create uninterrupted installation surface |
Black Line | ||
Version 2020 | 14/08/2020 - 14:24 | 4.0302.7d | General preparation | Remove any existing insulation or vapor barrier materials from installation area Remove any obstacles, fasteners, or protruding objects that will prevent insulation from fully contacting the bottom of the floor joist |
Prevent condensation, create uninterrupted installation surface |
Black Line |