Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 14/08/2020 - 14:25 | 4.0402.2e | Surface preparation | Remove any protrusions or impediments from the installation area that prevent full contact of insulation with foundation wall surface |
Properly bonded rigid foam installation |
Black Line | ||
Version 2020 | 14/08/2020 - 14:25 | 4.0402.2e | Surface preparation | Remove any protrusions or impediments from the installation area that prevent full contact of insulation with foundation wall surface |
Properly bonded rigid foam installation |
Black Line |