Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 14/08/2020 - 14:25 4.0402.2e Surface preparation

Remove any protrusions or impediments from the installation area that prevent full contact of insulation with foundation wall surface

Properly bonded rigid foam installation

Black Line
Version 2020 14/08/2020 - 14:25 4.0402.2e Surface preparation

Remove any protrusions or impediments from the installation area that prevent full contact of insulation with foundation wall surface

Properly bonded rigid foam installation

Black Line