Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2025 | 24/09/2023 - 17:15 | 4.0402.2f | Installation | Install insulation to prescribed R-value in a continuous layer in full contact with the foundation wall If installing multiple layers, offset seams by a minimum of 12" and seal the seams and joints of each layer before installing the next layer |
Contiguous and continuous thermal barrier |
We will adopt the suggested changes. This comment also addresses the same issue as comments made in 4.0402.4e. | Red Line | |
Version 2020 | 14/08/2020 - 14:25 | 4.0402.2f | Installation | Install insulation to prescribed R-value in a continuous layer in full contact with the foundation wall from ceiling to floor If installing multiple layers, offset seams by a minimum of 12" and seal the seams and joints of each layer before installing the next layer |
Contiguous and continuous thermal barrier |
Black Line | ||
Version 2020 | 14/08/2020 - 14:25 | 4.0402.2f | Installation | Install insulation to prescribed R-value in a continuous layer in full contact with the foundation wall from ceiling to floor If installing multiple layers, offset seams by a minimum of 12" and seal the seams and joints of each layer before installing the next layer |
Contiguous and continuous thermal barrier |
Black Line |