Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2025 24/09/2023 - 17:14 4.0402.5d Installation

Install insulation to prescribed R-value in a continuous boundary around the perimeter of foundation wall in contact with any waterproof membrane that exists at the foundation wall

Contiguous and continuous thermal barrier

We concur with the suggested changes. Red Line
Version 2020 14/08/2020 - 14:25 4.0402.5d Installation

Install insulation to prescribed R-value in a continuous boundary around the entire perimeter of foundation wall from top of band joist to floor, in contact with any waterproof membrane that exists at the foundation wall

Contiguous and continuous thermal barrier

Black Line
Version 2020 14/08/2020 - 14:25 4.0402.5d Installation

Install insulation to prescribed R-value in a continuous boundary around the entire perimeter of foundation wall from top of band joist to floor, in contact with any waterproof membrane that exists at the foundation wall

Contiguous and continuous thermal barrier

Black Line