Specification History
| SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status | 
|---|---|---|---|---|---|---|---|
| Version 2020 | 14/08/2020 - 14:27 | 6.0301.1a | Pre-work qualifications | Existing forced air system duct leakage to outside will be less than 10% of the air handler flow when measured at 25 pascals with reference to outside Any portion of the return located inside a combustion appliance zone will be sealed  | 
                      Prevent contamination through duct leakage  | 
                      Black Line | |
| Version 2020 | 14/08/2020 - 14:27 | 6.0301.1a | Pre-work qualifications | Existing forced air system duct leakage to outside will be less than 10% of the air handler flow when measured at 25 pascals with reference to outside Any portion of the return located inside a combustion appliance zone will be sealed  | 
                      Prevent contamination through duct leakage  | 
                      Black Line | |
| Version 2020 | 14/08/2020 - 14:27 | 6.0301.1a | Pre-work qualifications | Existing forced air system duct leakage to outside will be less than 10% of the air handler flow when measured at 25 pascals with reference to outside Any portion of the return located inside a combustion appliance zone will be sealed  | 
                      Prevent contamination through duct leakage  | 
                      Black Line |