Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 14/08/2020 - 14:27 7.0103.5b Installation

De-energize circuit and lock out power before work begins

Locate and install fixture in accordance with NFPA 101 and NFPA 70 and as specified by NECA/IESNA 500

Safe, proper, and functioning installation

Black Line
Version 2020 14/08/2020 - 14:27 7.0103.5b Installation

De-energize circuit and lock out power before work begins

Locate and install fixture in accordance with NFPA 101 and NFPA 70 and as specified by NECA/IESNA 500

Safe, proper, and functioning installation

Black Line