Specification History
| SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status | 
|---|---|---|---|---|---|---|---|
| Version 2020 | 14/08/2020 - 14:27 | 7.0103.5b | Installation | De-energize circuit and lock out power before work begins Locate and install fixture in accordance with NFPA 101 and NFPA 70 and as specified by NECA/IESNA 500  | 
                      Safe, proper, and functioning installation  | 
                      Black Line | |
| Version 2020 | 14/08/2020 - 14:27 | 7.0103.5b | Installation | De-energize circuit and lock out power before work begins Locate and install fixture in accordance with NFPA 101 and NFPA 70 and as specified by NECA/IESNA 500  | 
                      Safe, proper, and functioning installation  | 
                      Black Line | |
| Version 2020 | 14/08/2020 - 14:27 | 7.0103.5b | Installation | De-energize circuit and lock out power before work begins Locate and install fixture in accordance with NFPA 101 and NFPA 70 and as specified by NECA/IESNA 500  | 
                      Safe, proper, and functioning installation  | 
                      Black Line |