Version 2020 14/08/2020 - 14:28 7.0303.2d Piping location

Locate piping with the following priority: Within conditioned space; Within the building; Outdoor; Below ground (insulated and sleeved)

Prevent freezing and reduce thermal loss

Black Line
Version 2020 14/08/2020 - 14:28 7.0303.2d Piping location

Locate piping with the following priority: Within conditioned space; Within the building; Outdoor; Below ground (insulated and sleeved)

Prevent freezing and reduce thermal loss