Version 2025 02/03/2021 - 11:22 2.0401.1g Foundation Connections

Extend soil-gas retarder a minimum of 6" up all non air-permeable foundation walls and piers. (i.e., solid core block, brick, or poured concrete)

Seal it to all foundation walls and piers with a compatible material that creates an airtight, durable seal

Use mechanical foundation connections where feasible

Do not install in contact with non-treated structural wood

Extend soil-gas retarder over all air-permeable foundation walls or piers (i.e., hollow core block, brick, or rubble) except for required termite inspection gap

Do not install in contact with non-treated structural wood

Cover all potential entry points of radon with soil-gas retarder without compromising wooden foundation material

Black Line
Version 2025 02/03/2021 - 11:22 2.0401.1g Foundation Connections

Extend soil-gas retarder a minimum of 6" up all non air-permeable foundation walls and piers. (i.e., solid core block, brick, or poured concrete)

Seal it to all foundation walls and piers with a compatible material that creates an airtight, durable seal

Use mechanical foundation connections where feasible

Do not install in contact with non-treated structural wood

Extend soil-gas retarder over all air-permeable foundation walls or piers (i.e., hollow core block, brick, or rubble) except for required termite inspection gap

Do not install in contact with non-treated structural wood

Cover all potential entry points of radon with soil-gas retarder without compromising wooden foundation material

Black Line
Version 2025 02/03/2021 - 11:22 2.0401.1g Foundation Connections

Extend soil-gas retarder a minimum of 6" up all non air-permeable foundation walls and piers. (i.e., solid core block, brick, or poured concrete)

Seal it to all foundation walls and piers with a compatible material that creates an airtight, durable seal

Use mechanical foundation connections where feasible

Do not install in contact with non-treated structural wood

Extend soil-gas retarder over all air-permeable foundation walls or piers (i.e., hollow core block, brick, or rubble) except for required termite inspection gap

Do not install in contact with non-treated structural wood

Cover all potential entry points of radon with soil-gas retarder without compromising wooden foundation material