Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2025 12/10/2023 - 15:45 0.0401.1c Wall preparation 

Remove all exterior cladding from the installation area

Seal all holes, gaps, and penetrations in existing sheathing airtight

Remove any existing insulation or protrusions that prevent full insulation contact with existing air barrier

Replace any rotten or structurally weak substrate

, basic_html

Provide secure attachment surface for insulation panels to existing exterior sheathing

, basic_html
Red Line
Version 2025 12/10/2023 - 15:45 0.0401.1c Wall preparation 

Remove all exterior cladding from the installation area

Seal all holes, gaps, and penetrations in existing sheathing airtight

Remove any existing insulation or protrusions that prevent full insulation contact with existing air barrier

Replace any rotten or structurally weak substrate

, basic_html

Provide secure attachment surface for insulation panels to existing exterior sheathing

, basic_html
Red Line
Version 2025 12/10/2023 - 15:45 0.0401.1c Wall preparation 

Prepare wall for insulated panels by: 

removing existing siding 

removing all layers of siding down to structurally solid sheathing if multiple layers of siding are found 

leaving existing weather resistant barrier in place until just before panel installation if this weather protection is needed 

removing all protruding nails and staples from existing wall sheathing 

replacing any rotten or structurally weak substrate 

, basic_html

Provide secure attachment surface for insulation panels to existing exterior sheathing

, basic_html
Red Line