Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status |
---|---|---|---|---|---|---|---|
Version 2020 | 14/08/2020 - 14:23 | 4.0102.2b | General preparation | Prepare the surface according to manufacturer's specifications Install flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements |
Protect installed insulation |
Black Line | |
Version 2020 | 14/08/2020 - 14:23 | 4.0102.2b | General preparation | Prepare the surface according to manufacturer's specifications Install flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements |
Protect installed insulation |
Black Line | |
Version 2020 | 14/08/2020 - 14:23 | 4.0102.2b | General preparation | Prepare the surface according to manufacturer's specifications Install flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements |
Protect installed insulation |
Black Line |