Specification History

SWS Version Created Specification ID Title Specification Objective Rationale Status
Version 2025 05/15/2025 - 12:27 4.0102.2b General preparation

Prepare the surface according to manufacturer's specifications

Securely fasten markers or flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements.

Protect installed insulation

The committee agrees that clarifying the marking of junction boxes in attics is necessary to ensure consistent practices across the network and prevent misinterpretations. This prompted clarification across of all subsequent specifications under this topic and language was aligned for consistency. Red Line
Version 2020 08/14/2020 - 14:23 4.0102.2b General preparation

Prepare the surface according to manufacturer's specifications

Install flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements

Protect installed insulation

Black Line
Version 2020 08/14/2020 - 14:23 4.0102.2b General preparation

Prepare the surface according to manufacturer's specifications

Install flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements

Protect installed insulation

Black Line
Version 2020 08/14/2020 - 14:23 4.0102.2b General preparation

Prepare the surface according to manufacturer's specifications

Install flags at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements

Protect installed insulation

Black Line