Version 2020 14/08/2020 - 14:25 4.0401.2e Batt installation

Install batt insulation to prescribed R-value in every joist bay in full contact with the rim/band joist air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments

If batt contains a facing material install it toward the conditioned space

Continuous and contiguous thermal boundary