Specification History
| SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status |
|---|---|---|---|---|---|---|---|
| Version 2020 | 08/14/2020 - 14:25 | 4.0401.2e | Batt installation | Install batt insulation to prescribed R-value in every joist bay in full contact with the rim/band joist air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments If batt contains a facing material install it toward the conditioned space |
Continuous and contiguous thermal boundary |
Black Line | |
| Version 2020 | 08/14/2020 - 14:25 | 4.0401.2e | Batt installation | Install batt insulation to prescribed R-value in every joist bay in full contact with the rim/band joist air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments If batt contains a facing material install it toward the conditioned space |
Continuous and contiguous thermal boundary |
Black Line | |
| Version 2020 | 08/14/2020 - 14:25 | 4.0401.2e | Batt installation | Install batt insulation to prescribed R-value in every joist bay in full contact with the rim/band joist air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments If batt contains a facing material install it toward the conditioned space |
Continuous and contiguous thermal boundary |
Black Line |