SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status |
---|---|---|---|---|---|---|---|
Version 2025 | 15/05/2025 - 12:31 | 0.0501.1j | Committee deemed it appropriate to remove this specification as it was redundant with the testing specification and 12 months of system monitoring is potentially burdensome and inconsistent with other SWS specifications. This spec was combined with 0.0501.1k "Commissioning and Testing" below to streamline efforts and reduce overlap. This consolidation also supports the goal of aligning all solar specs to be applicable to both rooftop and ground-mount installations. | Red Line | |||
Version 2025 | 12/10/2023 - 16:36 | 0.0501.1j | Commissioning | Monitor the system energy delivery for a minimum of 12 months and compare results with predicted energy production , basic_html |
Validate system performance , basic_html |
Red Line | |
Version 2025 | 12/10/2023 - 16:36 | 0.0501.1j | Commissioning | Monitor the system energy delivery for a minimum of 12 months and compare results with predicted energy production , basic_html |
Validate system performance , basic_html |
Red Line | |
Version 2025 | 12/10/2023 - 16:36 | 0.0501.1j | Commissioning | Monitor the system energy delivery for a minimum of 12 months and compare results with predicted energy production , basic_html |
Validate system performance , basic_html |
Red Line | |
Version 2025 | 12/10/2023 - 16:36 | 0.0501.1k | Utility Documentation | Provide documentation to the building owner, including: copy of the installation and operation manual electrical diagrams and schematics certificate of inspection and approval system performance benchmark data , basic_html |
Facilitate ongoing maintenance and repairs , basic_html |
Red Line |