Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2025 10/12/2023 - 16:36 0.0501.1j Commissioning

Monitor the system energy delivery for a minimum of 12 months and compare results with predicted energy production

, basic_html

Validate system performance

, basic_html
Red Line
Version 2025 10/12/2023 - 16:36 0.0501.1j Commissioning

Monitor the system energy delivery for a minimum of 12 months and compare results with predicted energy production

, basic_html

Validate system performance

, basic_html
Red Line
Version 2025 10/12/2023 - 16:36 0.0501.1k Utility Documentation 

Provide documentation to the building owner, including:

copy of the installation and operation manual

electrical diagrams and schematics

certificate of inspection and approval

system performance benchmark data

, basic_html

Facilitate ongoing maintenance and repairs

, basic_html
Red Line