Specification | Objective |
---|---|
Select sealants that: are compatible with their intended surfaces, allow for differential expansion and contraction between dissimilar materials, meet the requirements of the applicable fire safety code (e.g. thermal or ignition barriers), and for use inside the pressure boundary select low volatile organic compound (VOC) sealants that meet independent testing and verification protocols |
Select safe and effective sealants |
- SF
- MH
- MF
Specification | Objective |
---|---|
Select: pest-resistant materials that adequately support applied load and are permanent air barriers, materials that meet the requirements of the applicable fire safety code (e.g. thermal or ignition barriers), and low volatile organic compound (VOC) materials for use inside the pressure boundary that meet independent testing and verification protocols |
Select safe and effective materials |
- SF
- MH
- MF
Specification | Objective |
---|---|
Remove any material from the sealing area that will prevent full adhesion of the selected sealant Remove any material from the glazing contact areas that will prevent a tight seal Remove push point or stops from replacement area |
Surface is clean and ready to accept sealant |
- SF
- MH
- MF
Specification | Objective |
---|---|
Select tempered safety glass as required by applicable codes Select replacement glazing with comparable tint and coating (color and look) that meets or exceeds existing glazing for thickness, including multiple IG panes, inert gas, and thermal performance Size replacement glazing 1/8" to 3/16'' smaller than opening to allow for movement of frame |
Properly select and size replacement glazing |
- SF
- MH
- MF
Specification | Objective |
---|---|
Secure glazing in frame using push points or appropriate stops on each side of opening Install glazing compound or sealant at all edges of the glass in accordance with manufacturer specifications Seal glazing, stops, and exterior window surfaces in accordance with original installation design |
Secure and seal glazing |
- SF
- MH
- MF
Specification | Objective |
---|---|
Verify safe operation and size of egress windows as required by local codes |