Continuous, contiguous, and safe thermal boundary that prevents air movement @ 50 Pascals
Specifications
- SF
- MH
- MF
Specification | Objective |
---|---|
Verify that installation area is free of: active water leaks, fuel leaks (i.e., gas, oil, propane), and pest intrusions energized or undammed knob and tube wiring uncovered electrical junctions improperly terminated devices (ventilation fans, dryers, plumbing stacks, condensate lines, combustion appliance flues/chimneys, etc.) unshielded high-temperature devices (non-IC rated recessed lights, chimneys, flues, vents, etc.) unless they are zero clearance devices insulation escape openings Verify that installation area is: intact, able to support insulation weight, and air sealed |
Ensure space can be safely insulated |
- SF
- MH
- MF
Specification | Objective |
---|---|
Select insulation that has a flame spread and smoke development index of 25/450 or less and backing material that has a smoke development index of 450 or less when tested in accordance with ASTM E84 or UL 723 Select rigid backing material that: is a permanent air barrier will support installed insulation without failure |
Select fire safe materials |
- SF
- MH
- MF
Specification | Objective |
---|---|
Select sealants that: are compatible with their intended surfaces allow for differential expansion and contraction between dissimilar materials meet the requirements of the applicable fire safety code (e.g., thermal or ignition barriers) are low volatile organic compound (VOC) sealants for use inside the pressure boundary that meet independent testing and verification protocols |
Select safe and effective sealants |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install flags that can be seen below the floor joists at any utility junctions that will be covered by insulation |
Identify utility junctions for future access |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install a rigid air barrier material over entire area to be insulated that will withstand insulation pressures Secure backing material using mechanical fasteners that penetrate the sub framing a minimum of 1" Seal all seams, joints, connections, etc. with a compatible sealant Installation must have a minimum of a 30-year service life |
Airtight, durable insulation backing |
- SF
- MH
- MF
Specification | Objective |
---|---|
Fill 100% of each cavity to capacity with the insulation in full contact with the air barrier |
Complete and consistent insulation coverage |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install closure system over all access holes that is airtight and permanent |
Airtight, durable, access closure |
- SF
- MH
- MF
Specification | Objective |
---|---|
Separate all foam products from living space with a thermal barrier material (e.g., 1/2" gypsum wallboard) as specified by applicable building code If space is used only for the service of utilities, foam will be separated from the space using a suitable ignition barrier covering or coating according to manufacturer's specifications If space is used for storage or occupancy, spray foam will be separated from the space using a thermal barrier material (e.g., 1/2" gypsum wallboard) as specified by applicable building code and manufacturer specifications If code requirements are unclear, consult local code officials for clarification |
Minimize ignition and combustion potential |
- SF
- MH
- MF
Specification | Objective |
---|---|
Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, minimum settled thickness, installed R-value, and number of bags installed |
Comply with 16 CFR 460.17 and document contract compliance |