Continuous, contiguous, pest and moisture resistant, and safe thermal boundary that prevents air movement @ 50 Pascals
Specifications
- SF
- MF
Specification | Objective |
---|---|
Verify that installation area is free of: active water leaks, fuel leaks (i.e., gas, oil, propane), and pest intrusions energized or undammed knob and tube wiring uncovered electrical junctions improperly terminated devices (ventilation fans, dryers, plumbing stacks, condensate lines, combustion appliance flues/chimneys, etc.) unshielded high-temperature devices (non-IC rated recessed lights, chimneys, flues, vents, etc.) unless they are zero clearance devices insulation escape openings Verify that installation area: is intact, able to support insulation weight, and air sealed has a sealed class I vapor retarder installed over all bare earth has all bulk sources of moisture directed away from the subspace walls (i.e. gutters, flashing, grading, drainage) |
Ensure space can be safely insulated |
- SF
- MF
Specification | Objective |
---|---|
Select sealants that: are compatible with their intended surfaces allow for differential expansion and contraction between dissimilar materials meet the requirements of the applicable fire safety code (e.g., thermal or ignition barriers) are low volatile organic compound (VOC) sealants for use inside the pressure boundary that meet independent testing and verification protocols |
Select safe and effective sealants |
- SF
- MF
Specification | Objective |
---|---|
Ensure wall vapor retarder will lap underneath the ground vapor retarder connection to the foundation wall Remove any incomplete or unsealed vapor barrier from the foundation wall |
Keep bulk water below vapor retarder and prevent condensation |
- SF
- MF
Specification | Objective |
---|---|
Remove any protrusions or impediments from the installation area that prevent full contact of insulation with foundation wall surface |
Properly bonded rigid foam installation |
- SF
- MF
Specification | Objective |
---|---|
Install insulation to prescribed R-value in a continuous layer in full contact with the foundation wall from ceiling to floor If installing multiple layers, offset seams by a minimum of 12" and seal the seams and joints of each layer before installing the next layer Install insulation to prescribed R-value in a continuous layer in full contact with the foundation wall If installing multiple layers, offset seams by a minimum of 12" and seal the seams and joints of each layer before installing the next layer |
Contiguous and continuous thermal barrier Contiguous and continuous thermal barrier |
- SF
- MF
Specification | Objective |
---|---|
Attach insulation with mechanical fasteners |
Insulation remains in place |
- SF
- MF
Specification | Objective |
---|---|
Seal all seams, joints, connections, etc. of insulation and vapor retarder layer with compatible sealant (i.e., tape, mastic, adhesive) Seal ground vapor retarder to the insulation vapor retarder with the foundation vapor retarder lapped under the ground vapor retarder |
Airtight and vapor controlled installation |
- SF
- MF
Specification | Objective |
---|---|
If termite pressure exists, maintain a 3" inspection gap from the top of the insulation to the bottom of any wood |
Allow for termite detection |
- SF
- MF
Specification | Objective |
---|---|
Separate all foam products from living space with a thermal barrier material (e.g., 1/2" gypsum wallboard) as specified by applicable building code If space is used only for the service of utilities, foam will be separated from the space using a suitable ignition barrier covering or coating according to manufacturer's specifications and the applicable building code If space is used for storage or occupancy, foam will be separated from the space using a thermal barrier material (e.g., 1/2" gypsum wallboard) as specified by applicable building code and manufacturer specifications If code requirements are unclear, consult local code officials for clarification |
Minimize ignition and combustion potential |
- SF
- MF
Specification | Objective |
---|---|
Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, and installed R-value |