Version 2020 08/14/2020 - 14:23 4.0103.1c General preparation

When vented eaves or soffits exist, mechanically fasten insulation baffles in every roof bay that extend above the final insulation level by at least 6"

Install a minimum of one insulation depth marker and one marker every additional 300 ft2 throughout installation area with measurement beginning at the air barrier

Install flags at all utility junctions that can be seen above the final level of the insulation

Protect insulation R-value, provide depth measurement, and locate junctions for future access

Black Line
Version 2020 08/14/2020 - 14:23 4.0103.1c General preparation

When vented eaves or soffits exist, mechanically fasten insulation baffles in every roof bay that extend above the final insulation level by at least 6"

Install a minimum of one insulation depth marker and one marker every additional 300 ft2 throughout installation area with measurement beginning at the air barrier

Install flags at all utility junctions that can be seen above the final level of the insulation

Protect insulation R-value, provide depth measurement, and locate junctions for future access