Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:23 | 4.0103.1d | Installation | Install batt insulation to prescribed R-value in every joist bay in full contact with the air barrier and all sides of the ceiling cavity without gaps, voids, compressions, or misalignments If batt contains a facing material, install it in contact with the conditioned space |
Continuous and contiguous pressure and thermal barrier of consistent R-value |
Black Line | ||
Version 2020 | 08/14/2020 - 14:23 | 4.0103.1d | Installation | Install batt insulation to prescribed R-value in every joist bay in full contact with the air barrier and all sides of the ceiling cavity without gaps, voids, compressions, or misalignments If batt contains a facing material, install it in contact with the conditioned space |
Continuous and contiguous pressure and thermal barrier of consistent R-value |
Black Line |