Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:23 4.0103.10e Close access

Remove existing sealant from the roof edge and J channel

Install new sealant at the original location

Install new J channel if existing J channel is damaged

Fasten roof and J channel to the original location with new screws

Seal all seams, edges, and penetrations of roof/wall connection

Weathertight roof closure

Black Line
Version 2020 08/14/2020 - 14:23 4.0103.10e Close access

Remove existing sealant from the roof edge and J channel

Install new sealant at the original location

Install new J channel if existing J channel is damaged

Fasten roof and J channel to the original location with new screws

Seal all seams, edges, and penetrations of roof/wall connection

Weathertight roof closure

Black Line