Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:24 4.0202.3d Access cavities

Remove skirting if it overlaps the siding

Remove fasteners from the bottom of the siding, working upward until the siding can be pulled away from the framing approximately 6" without damaging the siding

Install temporary fasteners at the seams near the bottom of the siding panels to prevent separation

Cut access through sheathing if present

Access cavities without damaging the siding or compromising the interior wall surface

Black Line
Version 2020 08/14/2020 - 14:24 4.0202.3d Access cavities

Remove skirting if it overlaps the siding

Remove fasteners from the bottom of the siding, working upward until the siding can be pulled away from the framing approximately 6" without damaging the siding

Install temporary fasteners at the seams near the bottom of the siding panels to prevent separation

Cut access through sheathing if present

Access cavities without damaging the siding or compromising the interior wall surface

Black Line