Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:24 | 4.0301.1c | General preparation | Remove any existing insulation or vapor barrier materials from installation area Install flags that can be seen below the floor joists at any utility junctions that will be covered by insulation |
Prevent condensation, identify utility junctions for future access |
Black Line | ||
Version 2020 | 08/14/2020 - 14:24 | 4.0301.1c | General preparation | Remove any existing insulation or vapor barrier materials from installation area Install flags that can be seen below the floor joists at any utility junctions that will be covered by insulation |
Prevent condensation, identify utility junctions for future access |
Black Line |