Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:24 4.0301.4d General preparation

Install airtight, rigid, blocking material at all cavity openings that aligns with the pressure boundary and will not fail under dense pack pressures

Install flags that can be seen below the floor joists at any utility junctions that will be covered by insulation

Identify utility junctions for future access

Black Line
Version 2020 08/14/2020 - 14:24 4.0301.4d General preparation

Install airtight, rigid, blocking material at all cavity openings that aligns with the pressure boundary and will not fail under dense pack pressures

Install flags that can be seen below the floor joists at any utility junctions that will be covered by insulation

Identify utility junctions for future access

Black Line