Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:24 4.0301.4i Insulation - onsite documentation

Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, minimum settled thickness, installed R-value, and number of bags installed

Comply with 16 CFR 460.17 and document contract compliance

Black Line
Version 2020 08/14/2020 - 14:24 4.0301.4i Insulation - onsite documentation

Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, minimum settled thickness, installed R-value, and number of bags installed

Comply with 16 CFR 460.17 and document contract compliance

Black Line