Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:24 4.0301.5c General preparation

Prepare the surface according to manufacturer's specifications

Install durable backing material over any escape holes in the air barrier

Install flags that can be seen below the floor joists at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements

Prevent SPF leakage, identify utility junctions for future access

Black Line
Version 2020 08/14/2020 - 14:24 4.0301.5c General preparation

Prepare the surface according to manufacturer's specifications

Install durable backing material over any escape holes in the air barrier

Install flags that can be seen below the floor joists at all utility junctions for future identification and ensure utility junctions remain accessible per local code requirements

Prevent SPF leakage, identify utility junctions for future access

Black Line