Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:24 | 4.0301.6d | Batt installation | Install batt insulation to prescribed R-value in every joist bay in full contact with the air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments If batt contains a facing material install it in contact with the conditioned space |
Continuous and contiguous thermal boundary |
Black Line | ||
Version 2020 | 08/14/2020 - 14:24 | 4.0301.6d | Batt installation | Install batt insulation to prescribed R-value in every joist bay in full contact with the air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments If batt contains a facing material install it in contact with the conditioned space |
Continuous and contiguous thermal boundary |
Black Line |