Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:24 4.0302.6e Installation

Install batts over 100% of accessible area to prescribed R-value in full contact with the air barrier and all structural framing without gaps, voids, compressions, or misalignments

If vapor retarder facing exists, install it facing the conditioned area

Continuous and contiguous thermal boundary that prevents excessive vapor intrusion

Black Line
Version 2020 08/14/2020 - 14:24 4.0302.6e Installation

Install batts over 100% of accessible area to prescribed R-value in full contact with the air barrier and all structural framing without gaps, voids, compressions, or misalignments

If vapor retarder facing exists, install it facing the conditioned area

Continuous and contiguous thermal boundary that prevents excessive vapor intrusion

Black Line