Specification History
| SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status |
|---|---|---|---|---|---|---|---|
| Version 2020 | 08/14/2020 - 14:25 | 4.0401.1c | General preparation | Remove existing insulation and vapor retarders from installation area Install durable backing material over any escape holes in the air barrier Ensure utility junctions remain accessible per local code requirements |
Prevent condensation, prevent SPF escape |
Black Line | |
| Version 2020 | 08/14/2020 - 14:25 | 4.0401.1c | General preparation | Remove existing insulation and vapor retarders from installation area Install durable backing material over any escape holes in the air barrier Ensure utility junctions remain accessible per local code requirements |
Prevent condensation, prevent SPF escape |
Black Line | |
| Version 2020 | 08/14/2020 - 14:25 | 4.0401.1c | General preparation | Remove existing insulation and vapor retarders from installation area Install durable backing material over any escape holes in the air barrier Ensure utility junctions remain accessible per local code requirements |
Prevent condensation, prevent SPF escape |
Black Line |