Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2025 | 09/24/2023 - 17:17 | 4.0401.3d | Insulation installation | Install rigid insulation to prescribed R-value in every joist bay in full contact with the rim/band joist air barrier and all sides of the cavity without gaps, voids, or misalignments |
Continuous and contiguous thermal boundary |
We concur with the suggested change. This is a simple verbiage change with no impact on installations. | Red Line | |
Version 2020 | 08/14/2020 - 14:25 | 4.0401.3d | Batt installation | Install rigid insulation to prescribed R-value in every joist bay in full contact with the rim/band joist air barrier and all sides of the cavity without gaps, voids, or misalignments |
Continuous and contiguous thermal boundary |
Black Line | ||
Version 2020 | 08/14/2020 - 14:25 | 4.0401.3d | Batt installation | Install rigid insulation to prescribed R-value in every joist bay in full contact with the rim/band joist air barrier and all sides of the cavity without gaps, voids, or misalignments |
Continuous and contiguous thermal boundary |
Black Line |