Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:25 | 4.0402.5g | Sealing | Install a continuous air barrier between the foundation and the interior of the basement that spans from the slab to the subfloor above Seal all seams, joints, connections, etc. of insulation on the conditioned side or create an airtight wall assembly on the conditioned side of the insulation |
Continuous air barrier on heated side of assembly |
Black Line | ||
Version 2020 | 08/14/2020 - 14:25 | 4.0402.5g | Sealing | Install a continuous air barrier between the foundation and the interior of the basement that spans from the slab to the subfloor above Seal all seams, joints, connections, etc. of insulation on the conditioned side or create an airtight wall assembly on the conditioned side of the insulation |
Continuous air barrier on heated side of assembly |
Black Line |