Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:25 | 4.0403.1a | Pre-work qualifications | Verify all bulk sources of moisture have been directed away from the slab (i.e., gutters, flashing, grading, drainage) Wall sill plate and slab edge penetration air sealing is completed No active pest intrusions exist |
Ensure space can be safely insulated |
Black Line | ||
Version 2020 | 08/14/2020 - 14:25 | 4.0403.1a | Pre-work qualifications | Verify all bulk sources of moisture have been directed away from the slab (i.e., gutters, flashing, grading, drainage) Wall sill plate and slab edge penetration air sealing is completed No active pest intrusions exist |
Ensure space can be safely insulated |
Black Line |