Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:25 | 5.0105.3a | General preparation | Remove previously existing duct materials from installation area that are damaged or wet Prepare trunk surface to accept new installation and sealants |
Prepare installation area and remove damaged materials |
Black Line | ||
Version 2020 | 08/14/2020 - 14:25 | 5.0105.3a | General preparation | Remove previously existing duct materials from installation area that are damaged or wet Prepare trunk surface to accept new installation and sealants |
Prepare installation area and remove damaged materials |
Black Line |