Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:26 | 5.0108.4j | Connections | Install equipment connections (e.g., electrical service, condensate drains, ductwork, fuel, venting, refrigerant lines) to allow for necessary service and repair access to all portions of the equipment |
Equipment connections do not interfere with operation and service of equipment |
Black Line | ||
Version 2020 | 08/14/2020 - 14:26 | 5.0108.4j | Connections | Install equipment connections (e.g., electrical service, condensate drains, ductwork, fuel, venting, refrigerant lines) to allow for necessary service and repair access to all portions of the equipment |
Equipment connections do not interfere with operation and service of equipment |
Black Line |