Version 2020 08/14/2020 - 14:27 7.0103.2b Removal

De-energize circuit and lock out power before work begins

Remove bulbs or fixtures per plan ensuring that no open connections will remain after work is finished

Terminate all unused electrical connections in appropriate covered junction box per NFPA 70

Seal any penetrations created by removal as per ANSI/NFPA /ICC Fire Code

Safe and proper removal of fixtures and bulbs

Black Line
Version 2020 08/14/2020 - 14:27 7.0103.2b Removal

De-energize circuit and lock out power before work begins

Remove bulbs or fixtures per plan ensuring that no open connections will remain after work is finished

Terminate all unused electrical connections in appropriate covered junction box per NFPA 70

Seal any penetrations created by removal as per ANSI/NFPA /ICC Fire Code

Safe and proper removal of fixtures and bulbs

Black Line