Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:27 | 7.0103.2b | Removal | De-energize circuit and lock out power before work begins Remove bulbs or fixtures per plan ensuring that no open connections will remain after work is finished Terminate all unused electrical connections in appropriate covered junction box per NFPA 70 Seal any penetrations created by removal as per ANSI/NFPA /ICC Fire Code |
Safe and proper removal of fixtures and bulbs |
Black Line | ||
Version 2020 | 08/14/2020 - 14:27 | 7.0103.2b | Removal | De-energize circuit and lock out power before work begins Remove bulbs or fixtures per plan ensuring that no open connections will remain after work is finished Terminate all unused electrical connections in appropriate covered junction box per NFPA 70 Seal any penetrations created by removal as per ANSI/NFPA /ICC Fire Code |
Safe and proper removal of fixtures and bulbs |
Black Line |