Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status |
---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:27 | 7.0103.3b | Removal and installation | De-energize circuit and lock out power before work begins Install ballasts in accordance with manufacturer specifications Clean the lens and reflector once installation is complete |
Safe and effective installation |
Black Line | |
Version 2020 | 08/14/2020 - 14:27 | 7.0103.3b | Removal and installation | De-energize circuit and lock out power before work begins Install ballasts in accordance with manufacturer specifications Clean the lens and reflector once installation is complete |
Safe and effective installation |
Black Line | |
Version 2020 | 08/14/2020 - 14:27 | 7.0103.3b | Removal and installation | De-energize circuit and lock out power before work begins Install ballasts in accordance with manufacturer specifications Clean the lens and reflector once installation is complete |
Safe and effective installation |
Black Line |