Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:28 | 7.0201.2c | Installation | De-energize circuit and lock out power before work begins Install equipment in accordance with NFPA 70 (Article 422.31), manufacturer specifications, and applicable code Install plumbing supply lines with the shortest length possible |
Safe and proper installation |
Black Line | ||
Version 2020 | 08/14/2020 - 14:28 | 7.0201.2c | Installation | De-energize circuit and lock out power before work begins Install equipment in accordance with NFPA 70 (Article 422.31), manufacturer specifications, and applicable code Install plumbing supply lines with the shortest length possible |
Safe and proper installation |
Black Line |