Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:28 7.0201.2c Installation

De-energize circuit and lock out power before work begins

Install equipment in accordance with NFPA 70 (Article 422.31), manufacturer specifications, and applicable code

Install plumbing supply lines with the shortest length possible

Safe and proper installation

Black Line
Version 2020 08/14/2020 - 14:28 7.0201.2c Installation

De-energize circuit and lock out power before work begins

Install equipment in accordance with NFPA 70 (Article 422.31), manufacturer specifications, and applicable code

Install plumbing supply lines with the shortest length possible

Safe and proper installation

Black Line